Manufacturing procurement, step by step: from requirement to purchase order

Manufacturing procurement runs from requirement to purchase order in seven steps, and you decide at three: the bill of materials (BOM), the supplier list and which supplier wins each line. Allied Mile runs the sourcing steps in between, from BOM review to quote comparison.

What you send and what you get back

You send

  • A BOM, or the drawings, CAD or schematics behind it
  • Target quantities, the price breaks you want quoted, and expected annual volume
  • Required dates and the delivery location
  • Any current suppliers you want invited to quote

You get back

  • A sourcing plan showing how each group of lines will be bought
  • A proposed supplier list for each group of lines
  • A side-by-side quote comparison at the same quantities: unit price at each break, tooling, lead time, MOQ (minimum order quantity) and terms
  • Questions on any line that can't be quoted as written

Who decides what at each step?

  1. You share the requirement

    On a call, walk us through what you are buying, rough quantities and timing, and any suppliers you use today. Then send the BOM, or the drawings behind it.

  2. You confirm the BOM

    You review the sorted BOM and confirm it before any sourcing starts. Before that, we go through every line, sort it as made-to-print, catalog or raw material, and ask about anything missing, such as a revision, material or quantity. If you started from drawings, you review the draft BOM first.

  3. We build the sourcing plan

    We group lines by how they should be bought. For each group that needs quotes, we find manufacturers in the U.S., Canada and Mexico that make that kind of part and vet them: process and material fit, volume-range fit, and a review of certificates when you require them.

  4. You approve the supplier list

    We show you the proposed suppliers for each group. Add one you already work with, strike one you'd rather not use, then approve the list. No request for quote (RFQ) goes out before that.

  5. We run the RFQs

    Each group gets an RFQ package with the drawings, revisions, quantities and requirements suppliers need to quote. We collect the responses and follow up on late ones. We route supplier engineering questions, such as a tolerance they can't hold as drawn, to you.

  6. We compare the quotes

    We put every response into the same columns at the same quantities, with a note wherever a quote departs from what was asked.

  7. You choose the supplier for each line

    Every quote names its supplier. You choose which supplier wins each line, keep the work with a current supplier, or hold a line for later, then contact the supplier and place the purchase order directly.

How does a sourcing plan group the lines of a BOM?

After you confirm the BOM, we set out how each group of lines will be bought and which groups need an RFQ. Here's an example: a 24-line industrial assembly partway through quoting.

Example — illustrative data
BOM line groupSourcing approachSupplier typesRFQ statusNext step
Machined brackets, 6 lines (e.g. BRKT-2210)RFQ at 250 / 1,000 / 5,000 pcs; tooling quoted separatelyCNC machine shops4 sent: 3 quoted, 1 declinedYou review the comparison
Turned shafts, 2 lines (e.g. SHFT-4410)RFQ at 250 / 1,000 pcs, ground finishCNC turning shops3 sent: 1 quoted, 2 pendingWe follow up on the 2 pending quotes
Sheet metal enclosures, 4 lines (e.g. ENC-3100)RFQ with powder coat, quoted with and without hardware insertionSheet metal shops3 sent: 2 quoted, 1 pendingWe follow up on the pending quote
Bar and plate stock, 3 lines (e.g. MAT-0310)Quote by grade, size and cut length, for parts you make in-houseMetal service centers2 sent: 2 quotedYou review the comparison
Fasteners and hardware, 9 lines (e.g. FST-0008)No RFQ; distribution recommendation, stays with your current distributorIndustrial distributorsNot quoted, your choiceNone

Catalog lines like the fasteners get a recommendation on where to buy from distribution; we don't buy them. Quotes that come back go into a separate quote comparison, not this plan.

Which starting point fits what you have today?

Start from what you have: a BOM goes straight to line review, drawings without a BOM get a draft BOM first, and a part you already buy goes out for benchmark quotes. Only the first step and your first decision change. The later steps follow the path above. If you'd rather one company quote and build the whole assembly, sourcing agent vs contract manufacturer compares that route with sourcing the parts.

What you haveWhere to startFirst stepYour first decision
A BOMBOM sourcingWe review every line and group lines by how they should be boughtWhether the sorted BOM is right, and which lines to quote now
Drawings, CAD or schematics, but no BOMBOM from drawingsWe draft a BOM from suitable files for your reviewWhether the draft BOM is correct
A part you already buy, or defined parts and known suppliers but no time to run RFQsSupplier quote comparisonWe send the RFQ package to the suppliers you name and to vetted alternatives you approveWhich suppliers receive the package
A part to buy and no suppliers yetSupplier findingWe find manufacturers that match the requirement and vet themWhich suppliers to invite to quote

When is a part worth sending out for quotes?

A part is worth quoting when a new quote could change your decision: a move to production volumes, a price, lead time or quality that has drifted, a single source, or a redesign that changes material or process. Quoting takes your team's time too, to confirm the BOM and answer supplier questions, so a steady part bought in small quantities or a customer-mandated source usually isn't worth it.

SituationWorth quoting?Why
A new product moving from prototypes to production quantitiesUsuallyPrototype suppliers are often not set up for production volumes
A part whose price, lead time or quality has driftedUsuallyA benchmark shows whether current terms still hold up against alternatives
A part with only one supplierUsuallyA quoted second source shows your options before a supply problem forces the question
A redesign that changes material or processUsuallySuppliers that fit the old part may not make the new one
A part with steady price and supply, bought in small quantitiesRarelyA new quote seldom changes enough to repay the time spent
A part your customer requires from an approved sourceNoThe source is fixed by your customer's requirement

Requirements and limitations

  • Prices, lead times and MOQs are the figures suppliers quote, and they can change before an order is placed.
  • Suppliers can decline to quote or not respond, so some lines may come back with fewer quotes than requested.

Questions buyers ask

What is the difference between procurement and sourcing?
Sourcing is the part of procurement that finds suppliers and gets quotes, from identifying who can make a part to sending RFQs and comparing the responses. Procurement is the whole path from requirement to purchase order, and in most companies it also takes in contracts, receiving and payment. We work on the sourcing steps, from a BOM or drawings to quotes you can compare.
Can you benchmark a part we already buy?
Yes. Share the drawing or specification. Vetted alternatives quote the quantities you set, so you can put their price at each break, tooling, lead time, MOQ and terms next to what you pay today. If you want your current supplier's fresh quote on the same sheet, add it to the supplier list when you approve it.
How do you decide which suppliers to ask for quotes?
We start from what each line needs: process, material, size, tolerances, finish and volume, then look for manufacturers that make that kind of part at that volume. Different groups of lines usually go to different kinds of shop, which is why the sourcing plan lists supplier types per group.