We draft a BOM from your drawings, CAD or schematics
Allied Mile drafts a bill of materials (BOM) from drawings, CAD or schematics when you don't have one. Each line names the file it came from; anything the files don't state becomes an open question. You approve the draft before sourcing starts.
What does a draft BOM look like?
Here's an example: seven lines of a small motorized assembly, drafted from an assembly drawing, two part drawings, a STEP assembly and a control-board schematic. The Source column names the sheet, view or file each line came from.
| Part | Qty | What the files state | Source | Open question |
|---|---|---|---|---|
| BRKT-1107 motor bracket | 2 | 5052-H32 aluminum, 0.090 in; finish not stated | Assembly drawing, sheet 1, item 3 | Finish: anodize, powder coat or bare? |
| RAIL-0730 guide rail | 1 | 303 stainless steel; tolerances on the drawing | Part drawing RAIL-0730, rev B | The assembly drawing calls rev A. Which revision should be quoted? |
| PLT-0520 base plate | 1 | 6061-T6 aluminum, 0.250 in; clear anodize | Part drawing PLT-0520, rev C | None |
| Front panel (no part number) | 1 | Material not assigned in the model | STEP assembly, component front_panel | Is there a drawing? If not, which material and finish? |
| M5 flat washer | 12 | A2 stainless steel | Assembly drawing, sheet 1, item 7; STEP assembly | Parts list says "as required"; the model shows 12. Confirm the quantity. |
| Capacitor, 10 µF, 25 V, X7R | 3 | No part number; package not stated | Schematic, sheet 2: C4, C7, C9 | Preferred part number or equivalent ratings? Which footprint? |
| Terminal block, 3 positions | 2 | 5.08 mm pitch; mating plug not shown | Schematic, sheet 3: J1, J2 | Is the mating plug in scope? |
The draft also marks each line made-to-print, catalog or raw material, the same split used in BOM sourcing. Here every line is made-to-print or catalog; the shops supply their own stock and price it in the part.
What you send and what you get back
You send
- PDF drawings: the assembly drawing with its parts list, and part drawings
- STEP or native CAD assemblies
- Schematics and PCB files
- Any partial parts list or spreadsheet BOM (xlsx or csv), however incomplete
- Build quantities and the revision you want quoted
You get back
- A draft BOM with a Source column naming the sheet, view or file behind each line
- Open questions tied to the lines they affect
- A revised draft with your answers and corrections worked in
How do drawings become a BOM suppliers can quote?
Book a call
Pick a time on our booking page. We talk through the files you have, your build quantity and the revision you want quoted, and we agree how you'll send files.
You send your files
Send the drawings, CAD, schematics and any partial parts list that describe the design. A partial set is fine; the draft will show what it leaves out.
We draft the BOM
We list every part the files show, record what they state about it, and note where it came from. Anything the files don't settle, such as a finish or a revision conflict, becomes an open question on that line.
You review the draft
Your team answers each open question, corrects anything we read wrong, and marks any line that is out of scope. We revise the draft and send it back. Nothing goes to a supplier until you approve it.
Sourcing starts
From the approved draft, the work continues as BOM sourcing: we find and vet manufacturers, you approve the supplier list, and we run the RFQs (requests for quote) and send you the quotes side by side at the same quantities.
What does each type of file show, and what does it lack?
Each file type carries part of what a supplier needs. An assembly drawing gives the parts list and quantities; part drawings give material, tolerances and finish; a CAD assembly gives structure and counts; a schematic gives components and values. Send what you have. Where two files disagree, we record both and flag the conflict as an open question instead of picking one.
Made-to-print parts ask the most of a drawing, and what a shop needs to see on the print differs between machining, sheet metal, casting and molding. Catalog parts mostly need a manufacturer part number (MPN) or the characteristics an equivalent must match.
| Input | What it usually shows | What it often lacks |
|---|---|---|
| Assembly drawing with a parts list (PDF) | Item numbers, part numbers, descriptions and quantity per assembly | Specs for purchased hardware, quantities marked "as required" (A/R), and the current revision of each child part |
| Part drawing (PDF) | Geometry, material callout, tolerances, finish and notes | Quantity per assembly and where the part sits in the build |
| STEP or native CAD assembly | Assembly structure, part names and part counts | Tolerances and finish notes, which usually live on drawings; material may be unassigned and hardware simplified |
| Schematic and PCB files | Components, values and reference designators, so quantities can be counted; PCB files add footprints and the board outline | Manufacturer part numbers, ratings the schematic doesn't show, and the bare board's fabrication notes |
| Partial spreadsheet BOM (xlsx or csv) or parts list | Part numbers, descriptions, preferred manufacturers or past purchase records your team already has | Agreement with the latest drawings or model; revisions and quantities are often behind |
When is a draft BOM line ready to quote?
A draft BOM line is ready for an RFQ when a supplier could quote it without guessing, which means every open question on it is answered. Most questions fall into the five groups below; our BOM template shows the column each answer fills.
| Topic | What we ask | Ready to quote when |
|---|---|---|
| Quantity | How many per assembly, how many assemblies per order, and which price breaks to quote | Quantity per assembly and order quantities are confirmed |
| Made-to-print parts | Which grade or alloy, which dimensions are critical, whether a general tolerance block applies, and which finish | Material, tolerances and finish are on the drawing or confirmed by you |
| Catalog parts | Preferred MPN, acceptable equivalents, and package or footprint | An MPN is named, or the characteristics an equivalent must match are listed |
| Documentation | Material certifications, certificates of conformance (CoC) or compliance declarations, such as RoHS, that suppliers must provide | Required documents are named |
| Revision and scope | Which revision is current, and whether cables, labels or packaging are included | The revision matches across files and scope is agreed |
Requirements and limitations
- Not every drawing, model or schematic holds enough for a complete BOM. Where a material, finish, tolerance or part number is missing, you supply it, or a drawing that states it, before that line can be quoted.
- Engineering decisions stay with you. Where a choice affects form, fit or function, such as a material grade or a substitute component, we ask rather than decide.
Questions buyers ask
- Will you sign a non-disclosure agreement before we send drawings?
- Yes. We sign your NDA (non-disclosure agreement) on request before you send any drawings. Raise it on the call and we sign before files move.
- Our schematic has no manufacturer part numbers. Is that a problem?
- No. We list each component by value, rating where shown and reference designator, count how many the schematic shows, and flag any marked do-not-populate. The missing part numbers and footprints come back to you as open questions: name preferred parts, confirm packages from your PCB design, or describe what an equivalent must match.
- Do our drawings need to be final and released?
- No. Work-in-progress drawings, models or schematics can start a draft BOM. Tell us which revision you want quoted, and expect quotes on a changing design to need refreshing after the next revision. If you're moving from prototype toward production, see sourcing for hardware startups.
- Can you draft a BOM from a 3D model with no drawings?
- Yes, as a start. The assembly structure gives us the parts and their counts. Tolerances, finish and often material aren't in the model, so for each made-to-print line, send a drawing or give us the material, finish and critical dimensions, and the RFQ states them.
- What about parts we already buy from a current supplier?
- Tell us which lines those are and we mark them on the draft. You decide, line by line, whether a part stays with its current supplier or is quoted against that supplier as the baseline.
Have drawings but no BOM?
Related pages
- BOM sourcingBOM sourcing with Allied Mile: we sort every line, find and vet manufacturers for your custom parts, run the RFQs and line up the quotes side by side.
- BOM templateDownload Allied Mile's manufacturing BOM template (Excel or CSV): 17 columns, a filled example line, and which fields a supplier needs before it can quote.
- Sourcing for hardware startupsSourcing for hardware startups with Allied Mile: what to buy and how to quote it at prototype, pilot and production, and what suppliers need from a small team.
- Custom parts sourcingCustom parts sourcing from drawings: what each shop needs in the drawing package to quote, what its quote is made of, and how Allied Mile runs the RFQs.
- Second source suppliersHow to qualify a second source for a single-source part with Allied Mile: one RFQ to vetted candidates, tooling ownership and transfer, and first articles.