How we find a manufacturer that fits your part
Finding a manufacturer that fits means narrowing by process, material, size, volume and certifications, then confirming each candidate makes that kind of part at your volume. Allied Mile does both; you approve the supplier list before any RFQ (request for quote) goes out.
What does a manufacturer have to fit before it quotes?
Fit means the shop makes this kind of part, in this material, at your volume, with the documents you need. Here's an example: the checks for SHFT-0310 Rev A, a turned and ground 416 stainless shaft quoted at 100 / 1,000 / 5,000 pieces.
| Requirement | What we check | Why it matters |
|---|---|---|
| Process: turned, then ground | Turning and grinding are regular work, in-house or at a grinder the shop uses routinely | A turning shop without grinding adds a second shop's lead time inside its quote, or quotes turned-only and misses the finish. |
| Material: 416 stainless, material cert per lot | Stainless is usual work, and the shop supplies material certs with each lot | A shop that runs 416 often holds the tolerance and prices the bar realistically. |
| Size envelope: bar-fed shaft, standard lathe | Bar capacity and length between centers cover the drawing | A part at the edge of a shop's envelope comes back as a no-quote, or as a workaround you pay for. |
| Volume: 100 / 1,000 / 5,000 pieces | The shop's usual lot sizes bracket those quantities | A prototype shop prices 5,000 high or declines; a high-volume shop won't set up for 100. |
| Certifications: ISO 9001, which your customer requires | We ask for the current certificate and read it; a logo on a website isn't proof | If the paperwork is a condition of your order, a shop without it is out, however good its price. |
| Location: delivery to your plant | Shop location against your delivery point and any region you prefer or can't use | Distance adds shipping time, and travel time for your quality team. |
| Your constraints: shops to include or avoid | Your include and exclude list is applied before the list reaches you | Keeps a current supplier's quote on the same sheet if you want it, and saves you striking names at approval. |
Every name on the list you approve has passed the three vetting checks: rows one to three are process and material fit, with the size envelope counted as part of process fit; row four is volume-range fit; row five is the certificate review. Location and your constraints narrow the search; they aren't judgments about the shop. For a whole bill of materials (BOM), the same checks run line by line in BOM sourcing.
What you send and what you get back
You send
- A drawing (PDF, plus STEP if you have it) with material, finish and the tolerances that matter
- The lot sizes to quote and the expected annual volume
- Certificates and documents you require, such as material certs or a certificate of conformance
- Delivery location, and any shops to include or avoid
You get back
- A supplier list for your approval: each candidate, where it is, and how it fits the process, material and volume range
- Questions on anything in the requirement a shop would ask about before quoting
- After you approve the list, RFQs to those shops and the quotes side by side at the same quantities
How does a requirement become a supplier list?
You describe the part
On a call, you tell us what the part is, how many you need and when, which certificates your order depends on, and any shops you already use or won't use again, with the reason. A shop that missed dates at your volume tells us something about the volume range to search. Then you send the drawing; we sign your NDA (non-disclosure agreement) on request before you do.
We turn the requirement into search criteria
From the drawing we set six criteria: the process it calls for, the material and finish, the size envelope, the volume range, the certifications you require, and the delivery region. If something is missing, such as the finish or the annual volume, we ask before we search, because a search on an open requirement returns shops that can't quote it. What each process needs on the drawing differs, and a shop reads the print before it decides whether to quote.
We search
We look for manufacturers in the U.S., Canada and Mexico whose regular work matches those criteria. Process and material cut the field most, so they come first; volume range cuts next, then certifications and location narrow what's left.
We vet each candidate
Every shop the search returns gets the three vetting checks, set out under "What does vetting cover?" below. Fail one and it comes off the list.
You approve the supplier list
You see every candidate before any RFQ goes out. Add a shop you already use, strike one you'd rather not ask, then approve.
We send the RFQs
Each approved shop gets the drawing, revision, quantities, material, finish and required documents. Engineering questions from a shop come to you. Quotes come back side by side at the same quantities, each naming its supplier; you contact the shop you choose and place the PO (purchase order) directly.
What does vetting cover, and what doesn't it?
Vetting here means three checks on each candidate. Process and material fit: the shop makes this kind of part, in this material, as regular work rather than as a favor. Volume-range fit: its usual lot sizes bracket yours. Certificate review: we ask for the certificate your requirement names, such as an ISO 9001 registration or material certs, and read it.
Those three checks are the whole of vetting. They narrow the field to shops worth asking; qualifying the shop you choose, such as a first-article inspection (FAI) or your quality team's supplier survey, stays with you on the PO you place.
Requirements and limitations
- A fit on paper doesn't oblige a shop to quote. Some decline small lots, unusual materials or short dates, so an approved list can return fewer quotes than names.
- Certificates are reviewed only when your requirement names them. If you don't ask for a quality registration or material certs, we don't filter on them, so state them up front.
Questions buyers ask
- Why not just put the part on a manufacturing marketplace?
- For a handful of prototypes, a marketplace is often the quickest route. For production lots, who makes the part starts to matter: you want to qualify the shop, hold it to a revision and know who owns the tooling. The marketplace chooses the shop, and whether it tells you which one varies. Manufacturing marketplace vs direct sourcing sets the options side by side.
- We already buy this part. Is a search still useful?
- Yes, as a second source. The current supplier's price, lead time and terms become the baseline the candidates quote against, and tooling ownership decides how much moving the part would cost. Second-source suppliers covers how that search runs.
- What if no shop fits the requirement?
- We say so. An unusual material, a tolerance beyond common equipment or a very small lot can leave the list short. The choices are yours: adjust the requirement, such as a different grade or tolerance class, or relax a criterion you'd rather keep, such as location.
- We have a design but no drawings yet. Can you find a manufacturer?
- A manufacturer quotes a drawing or a written specification, not a concept. Get the part onto a drawing with material, finish and critical dimensions first; from there the search runs as above. If what you have is CAD for an assembly but no drawings or BOM, we can draft a BOM from the CAD and flag what it doesn't state, but the part drawings still have to come from you before a shop will quote.
Have a part that needs a manufacturer?
Related pages
- Custom parts sourcingCustom parts sourcing from drawings: what each shop needs in the drawing package to quote, what its quote is made of, and how Allied Mile runs the RFQs.
- Second source suppliersHow to qualify a second source for a single-source part with Allied Mile: one RFQ to vetted candidates, tooling ownership and transfer, and first articles.
- Marketplace vs direct sourcingXometry, Fictiv, Protolabs Network, Fathom and Jiga vs buying direct from shops, alone or with Allied Mile: who you deal with, BOM handling, MOQs, tooling.
- BOM sourcingBOM sourcing with Allied Mile: we sort every line, find and vet manufacturers for your custom parts, run the RFQs and line up the quotes side by side.
- BOM from drawingsHave drawings, CAD or schematics but no BOM? Allied Mile drafts the bill of materials, names the file behind each line and flags gaps as open questions.