Custom parts sourcing: which shop quotes your part, and what it needs

Custom parts are quoted by whichever shop runs the process on the drawing, and each process needs its own drawing package. Allied Mile flags what each shop will ask for, finds and vets manufacturers for each part, and runs the RFQs (requests for quote).

What does each kind of shop need to quote a made-to-print part?

A quote starts with the drawing package, and what has to be in it depends on the process. Here is what each kind of shop typically needs to see, what its quote is made of, and what sets its MOQ (minimum order quantity). Shop here means any manufacturer that runs the process, from a machine shop to a foundry.

What shops typically need and quote, by process; your parts may differ
ProcessDrawing package needsQuote componentsWhat sets the MOQ
Machined (CNC milling and turning)2D drawing (PDF) with dimensions, tolerances and thread callouts; STEP model; material grade and condition, e.g. 6061-T6; surface finish and any coating or plating; the inspection you require, such as FAI (first-article inspection) or material certsUnit price at each quantity; setup, either inside the unit price or as a one-time line; fixtures for repeat features; outside finishing (anodize, plating, heat treat); inspection reportsMany shops quote from one piece. Setup is spread over the lot, so the unit price falls steeply between small breaks.
Sheet metal (cut, form, weld)Drawing with material and gauge, e.g. 14 ga cold-rolled steel; STEP model for formed parts; hardware (inserts, studs) by part number; weld symbols; finish spec and color; cosmetic faces markedUnit price at each quantity; setup per run; form tooling or weld fixtures as a one-time line where the part needs them; hardware and insertion; welding; finishing (often an outside powder coater); packagingOften low. Setup per run is the usual one-time charge; a form tool or weld fixture adds a tooling line on some parts. Many shops set a minimum order value rather than a piece count.
Casting (sand, investment, die)3D model of the finished part; which surfaces are machined after casting; alloy and heat treat; wall thickness; draft and parting line, or room for the foundry to propose them; a machining drawing for post-cast features; pressure, X-ray or cert requirementsPattern or die tooling as a one-time line, with ownership and maintenance terms; unit price per casting; secondary machining; heat treat and finishing; inspectionSet by the tooling. Sand and investment casting take smaller runs; die casting usually needs a volume that pays back a hardened steel die.
Injection molding3D model (STEP); resin by grade, color and additives, or the properties an equivalent must meet; critical dimensions and tolerances on a 2D drawing; cosmetic surface and texture spec; where gates and ejector marks are not allowed; annual volume; regulatory marks, e.g. UL or food contactMold tooling as a one-time line (cavity count, steel class, expected life, ownership); unit price at each quantity, often tied to a resin price; secondary work such as inserts, printing or assembly; first-shot samplesThe mold pays back over volume, and resin comes by the bag or drum, so molders set a minimum run per setup. Some offer a shorter-life prototype mold for small runs.
Molded rubber (compression, transfer, injection)Drawing or 3D model; elastomer and durometer, e.g. EPDM, 70 Shore A; color; tolerance class, flash and trim limits; any metal inserts to bond; chemical, temperature or compliance requirements, such as FDA or ULMold tooling as a one-time line; unit price at each quantity; compound cost, higher for a custom mix; post-cure, trimming and deflashing; insert bondingThe mold's cavity count sets the lot size, and a custom compound is mixed by the batch, which raises it. Many molders set a minimum order value per run.

Shops add to this list for their own process. A question from one shop usually marks something another shop would have guessed at.

What you send and what you get back

You send

  • Part drawings as PDF, at the revision you want quoted, plus STEP or native CAD where you have it
  • Quantities per order and per year, and the price breaks you want to see
  • Material, finish and inspection requirements that aren't already on the drawing
  • Suppliers to include or avoid, and your NDA (non-disclosure agreement) if you want it signed first

You get back

  • Questions on any part that can't be quoted as drawn
  • A supplier list for each process, for your approval
  • A quote comparison per part at the same quantities: price, tooling, lead time, MOQ and terms, with exclusions noted and a supplier named on every quote

How does custom parts sourcing work from drawings?

  1. You send drawings and quantities

    Send the part drawings at the revision to quote, with quantities and price breaks. We sign your NDA on request before any drawing moves, and we agree how you'll send files on the call. A few standalone parts can be quoted from their drawings; if they belong to an assembly with no BOM (bill of materials), we can draft a BOM from your drawings first.

  2. We review each drawing

    For each part we note the process the drawing points to and flag what that kind of shop will ask about: material grade, tolerances, finish, inspection. Gaps come back to you as questions before the RFQ, not as guesses in the quotes.

  3. We find and vet manufacturers

    We find manufacturers in the U.S., Canada and Mexico that run the process at your volume. Vetting means three checks: process and material fit, volume-range fit, and certificates reviewed when you require them.

  4. You approve the supplier list

    You see the list for each part and approve it before any RFQ goes out. A shop you already use can go on it, and one you'd rather not ask comes off.

  5. We run the RFQs

    Each shop gets the drawing, revision, quantities, material and finish, and is asked to quote tooling separately and to state what the price includes. If a shop has an engineering question, such as a tolerance it can't hold as drawn, we send it to you to answer.

  6. You compare the quotes

    You get the quotes side by side at the same quantities, each naming its supplier. You choose, contact the shop and place the PO (purchase order) directly.

Which kind of shop should quote your part?

The drawing decides. Material, geometry and the features called out on it point to one process, and that process points to a kind of shop: a milled aluminum housing goes to CNC machine shops, a formed steel bracket to sheet metal shops, an EPDM gasket to rubber molders. Send a part to the wrong kind of shop and you get a no-quote, or a quote that reads the print the way that shop's own process would make it.

Volume and size narrow the field further: a shop that runs the process may not run it at your quantity, or its machines may not fit your part.

Parts that need two processes, such as a casting machined after pouring or a molded part with a bonded insert, go to the primary shop. It either quotes the secondary work itself or names a partner, and which one it is shows up in the quote and in who answers for the finished dimensions.

What makes a custom-part quote hard to compare?

Three lines: tooling, finishing and inspection, because shops put them in different places. One quote carries them inside the unit price, the next lists them separately or leaves them out, so the cheapest unit price is not always the cheapest part.

The RFQ fixes most of this. Every shop is asked for the same quantities, for tooling as its own line and for a statement of what the price includes; the quote comparison notes where a response departs from that. The tooling example in BOM sourcing shows how far the ranking moves once tooling and finishing are added.

Where shops put the three lines, and what to ask for in the RFQ
Quote lineWhere shops put itWhat to ask for
Tooling and fixturesInside the unit price, as a one-time line, or called NRE (non-recurring engineering); ownership rarely stated unless askedTooling as its own line, with who owns it and what it costs to move or replace
FinishingIncluded when the shop finishes in-house; left out, or marked for you to arrange, when an outside finisher does itThe finish spec quoted in, or an explicit exclusion so the finisher's price can be added
Inspection and certsA per-lot report, a per-piece charge, or silence; material certs are sometimes charged forThe documents you need named, such as FAI, material certs or a CoC (certificate of conformance), and quoted or confirmed as included

Which drawing details move the price most?

The tightest tolerance on the print, the finish and the material callout, roughly in that order, with quantity alongside them. A tolerance tighter than the title block adds a slower process and an inspection step; a finish given as a word rather than a spec gets guessed at; a material named by family rather than grade invites substitution.

Setup and tooling are spread over the lot, so the same drawing comes back at very different unit prices from shops that assumed different lots: state your break quantities in the RFQ, not a single number. For machined parts, the fields that move the price, from tolerance class and surface finish to threads, deburr and inspection reports, are set out on CNC machining for production runs, with a shaft quoted at three quantities.

Requirements and limitations

  • Quotes follow the drawing revision that went out. A tolerance, material or finish change after the RFQ means new quotes on that part, because shops price the print they were sent.
  • Shops decide what they quote. A part outside a shop's size envelope, tolerance range or volume comes back as a no-quote, and we tell you so rather than change the drawing. Tolerance, material and finish decisions stay with you.
  • Tooling ownership and finishing terms are settled between you and the shop in your PO. Tooling as its own line lets you compare quotes; it doesn't decide who owns the mold, die or fixture.

Questions buyers ask

We only have 2D PDF drawings, no 3D models. Can shops quote from them?
Machine shops and sheet metal shops usually can, if the drawing carries material, tolerances and finish. Foundries and molders generally want a 3D model, because the tooling is built from it. Send what you have and say which parts have no model.
We need a small quantity of a molded plastic part. Is tooling worth it?
Often not at prototype quantities. Have the part quoted machined from stock alongside the molder's prototype and production tooling, and set each tooling line against the quantity you expect over the part's life. For a few dozen pieces the machined route is often cheaper, and the tooling decision can wait until the design settles.
Can one shop make all of our parts?
Rarely, when the parts span processes. A machine shop doesn't pour castings and a molder doesn't form sheet metal, though some shops subcontract the rest and quote the lot. Quoting each process with the shops that run it shows you what each part costs and who makes it.
Do the drawings need to be in a BOM first?
No. Send the part drawings with quantities; a few parts can be quoted on their own. If they belong to an assembly, the BOM is worth sending as well, since it shows which drawings are missing and which lines don't need a quote at all.

Have drawings for parts you need made?