BOM sourcing: side-by-side quotes for your custom parts

BOM sourcing gives every line of your bill of materials a supplier and a price. Allied Mile sorts each line, finds and vets manufacturers, and runs the RFQs (requests for quote). You get side-by-side quotes: price, tooling, lead time, MOQ (minimum order quantity) and terms.

What does a BOM sourcing plan look like?

A sourcing plan gives every line a type (made-to-print, catalog or raw material), a route and a status, so you can see what is out for quotes and what is waiting on you. Here's an example: a five-line BOM for a small enclosure, partway through sourcing.

LinePartTypeRouteStatus
10BRKT-1042 Rev C bracket, 14 ga steel, powder coatMade-to-printQuote with sheet metal shops3 of 3 quotes in, 2 with tooling
20SHFT-0310 Rev A shaft, 416 stainlessMade-to-printQuote with CNC turning shops1 of 3 quotes in, finish question open
30HSG-3305 Rev A housing, anodized aluminumMade-to-printQuote with CNC milling shopsWaiting on your drawing
40416 stainless bar (stock for line 20)Raw materialLeft to the part makerPriced in line 20 quotes
50M4 x 10 socket head screwCatalogBuy from distributionNo RFQ needed

What you send and what you get back

You send

  • Your BOM, with drawings for made-to-print lines
  • Quantities, target dates and delivery location
  • Required certifications and any suppliers to include or avoid

You get back

  • A sourcing plan for every line
  • A quote comparison for each quoted line
  • Questions on any line that can't be quoted as sent

How does BOM sourcing work?

  1. We review your BOM

    We look through each line and mark it made-to-print, catalog or raw material. We flag anything a supplier would ask about, like a missing revision.

  2. We find and vet suppliers

    For each line worth quoting, we find manufacturers in the U.S., Canada and Mexico that make that kind of part. Vetting means three checks: process and material fit, volume-range fit, and certificates reviewed when you require them.

  3. You approve the supplier list

    You see the supplier list for each line and approve it before any RFQ goes out. Add a shop you already use, or strike one you'd rather not ask.

  4. We run the RFQs

    Each supplier gets the drawing, revision, quantities, material and finish. We collect the responses and follow up on gaps. If a shop has an engineering question, such as a tolerance it can't hold, we send it to you to answer.

  5. You compare the quotes

    You receive side-by-side quotes at the correct quantities, each naming its supplier. We note anything a quote leaves out, such as finish. You choose, contact the supplier and place the PO (purchase order) directly.

How does tooling change which quote is cheapest?

Tooling is paid once, so at modest volumes it can outweigh a lower unit price. Here's an example: three sheet metal shops quote 500 BRKT-1042 brackets. Supplier B has the cheapest unit price but costs the most once tooling is added, and its price leaves out the powder coat.

Even leaving the powder coat aside, B only becomes the cheapest above about 2,100 brackets. That's why our quote comparison lists tooling separately and notes what each price includes.

SupplierUnit priceToolingTotal at 500 pcsLead timePowder coat
Supplier A$4.85$1,200$3,6254 weeksIncluded
Supplier B$4.10$2,750$4,8006 weeksNot included
Supplier C$5.40None$2,7003 weeksIncluded

Which BOM lines get quoted, and which go to distribution?

Made-to-print lines get quoted: machined, sheet metal, cast and molded parts have no catalog price, so what you pay depends on which shop you ask. Not sure a part is worth quoting at all? See when a part is worth sending out for quotes.

Catalog parts like fasteners and bearings usually belong with distribution: published prices, stock you can check, small orders. For those lines we recommend a distributor; we don't buy them for you. Going direct can lower the unit price at volume, but often brings MOQs and longer lead times. Raw material usually stays with the part maker.

Some lines sit between types. A catalog part with extra work, like an extrusion cut to length, is quoted as made-to-print, since the shop doing the work sets the price. A part only one company makes, like a proprietary connector, stays catalog. The question there is stock and lead time.

What does a quote-ready BOM line need?

A quote-ready line needs eight fields: part number, revision, description, quantity per assembly, annual or lot quantity, material, finish and a drawing reference. Our BOM review flags any made-to-print line missing one of them, because incomplete lines come back as no-quotes or guesses.

Our BOM template has a column for each. Here's an example, using the bracket from line 10 of the sourcing plan above.

FieldExampleWhy it matters
Part numberBRKT-1042Ties every quote to one line.
RevisionRev CA quote on Rev B isn't a quote on Rev C.
DescriptionFormed steel bracketShows if the part fits a shop's process.
Quantity per assembly2Sets the part count: 2 × 250 assemblies = 500 brackets a year.
Annual or lot quantity250 assemblies a yearDrives price breaks, tooling and whether you meet a supplier's MOQ.
Material14 ga cold-rolled steelNarrows which shops can make the part.
FinishBlack powder coatOften done by a separate finisher, so some quotes leave it out.
Drawing referenceBRKT-1042 drawing, Rev CHolds tolerances and critical features.

Requirements and limitations

  • Vetting narrows the field. It doesn't replace your own qualification, such as a first-article inspection.
  • Quotes match the BOM revision that went out. If revisions, quantities or materials change, those lines need new quotes.
  • Suppliers set their own prices, lead times and quote validity. Not every RFQ draws a response, especially at very low quantities or for unusual processes.

Questions buyers ask

Why not send the whole BOM to a contract manufacturer?
Sometimes you should. A contract manufacturer is simpler if you want one supplier for the finished assembly, but it often quotes one price for everything. We send each made-to-print line to shops that make that kind of part, so you see what each part costs. Sourcing agent vs contract manufacturer sets the two routes side by side.
How do you make quotes comparable?
Suppliers quote differently: one prices 100 and 500 pieces, another 250; one builds tooling into the piece price, another lists it separately. We set the quantities and format in the RFQ so the responses line up.
What if I don't have a BOM yet?
Send drawings, CAD files or schematics. We can turn suitable files into a draft BOM for you to approve before sourcing starts.
Should I send the full BOM or only the hard-to-source lines?
Partial BOMs are fine. The full BOM is more useful: seeing every line lets us spot catalog parts better bought from distribution, raw material already covered by a part quote, and lines missing information.

Have a BOM to quote?